Cement Plants, Mines, Quarries and Every Industrial Site
Each one stores different material, counts it its own way and closes the month on different figures. Here is what we follow in each.
Clinker, Fuels and Raw Materials in Tonnes, Before the Month-end Close.
A cement plant keeps its stock in open yards, covered halls and domes, and finance wants one figure per material at the end of the month. We fly the yards and scan the halls in the same week, turn volumes into tonnes with the densities your quality team approves, and set them against your book stock.
What We Measure
- Limestone, clay, sand and iron ore in the raw material yard
- Gypsum, pozzolana, slag and fly ash
- Fuels, including alternative fuels such as biomass or tyre chips
- Clinker in halls and domes, scanned with LiDAR
What You Receive
- Month-end stock in tonnes, per material
- Physical against book stock, with each gap explained
- Days of fuel and clinker left, from the consumption you give us
The Pit, the ROM Pad and the Haul Roads, in One Survey, as Often as You Need It.
Mine planning needs to know what was really dug since the last survey, zone by zone, and whether the haul roads are still safe for the trucks. We survey the pit, the ROM pad and the dumps, compare the surface with your mine plan, give the volume moved in each zone, and check every ramp for gradient, width and berm height.
What We Measure
- Volume mined per zone and per bench, against the plan
- ROM pad, ore, low-grade and waste stockpiles
- Haul ramp gradient and road width
- Berm height, against the wheels of your largest truck
What You Receive
- Planned, mined, hauled and processed, side by side
- The latest surface for your planning software
- Road sections outside your rules, on a map
Your Stock per Product, in Tonnes, Checked Against the Weighbridge.
A quarry sells by the tonne at the weighbridge, but the stock on the yard is often estimated by eye. We measure every product pile, compare the change with what you produced and sold, and show where piles have run into each other or where yard space is going to waste. The same survey maps the working face against your permit boundary.
What We Measure
- Volume and tonnes per product: sand, chippings, gravel, ballast, rip-rap
- Cone piles under stackers and conveyors
- Piles that have mixed, and the free space on the yard
- The working face against the permit limit
What You Receive
- Stock per product, in tonnes
- Produced minus sold, against the change on the ground
- A face advance map for your permit file
Whatever Your Industry, Know What Is Really on Your Site.
Every industrial site receives, stores and uses material, and the stock on the ground has to match your records. We survey your stock wherever it is, in the open or under a roof, set it against what was received and used, and the same flight shows the drainage, dust and access problems your team should know about.
What We Measure
- Stockpiles of any material, in open yards
- Stock in halls, domes and sheds, with LiDAR
- Stock received against stock used
- Drainage, dust and access, on the same flight
What You Receive
- Stock per material, as often as you need it
- Stock on the ground against your records
- Inspection findings with photo and position
Tell Us About Your Site.
Talk to Our Account TeamWe start with a paid pilot on one site, sized to what you want to measure. See what you receive