We Make Your Site Intelligent. By Drone, LiDAR and AI.

Your stock, your pits and your roads, surveyed as often as you need. Our AI reads them with your ERP and your team’s files, and tells you what changed and what to do first.

Clinker, Fuels and Raw Materials in Tonnes, Before the Month-end Close.

  • Clinker
  • Fuels
  • Gypsum
  • Limestone and clay
See the details

The Pit, the ROM Pad and the Haul Roads, in One Survey, as Often as You Need It.

  • ROM pad
  • Ore and waste
  • Benches and ramps
  • Plan against actual
See the details

Your Stock per Product, in Tonnes, Checked Against the Weighbridge.

  • Sand and gravel
  • Crushed products
  • Weighbridge
  • Permit boundary
See the details

Whatever Your Industry, Know What Is Really on Your Site.

  • Any bulk material
  • Open yards
  • Halls and domes
  • Received against used
See the details
See it work

Your Stockpile, from Outline to Volume

A real session in the Farness studio. You draw roughly around a pile and press Measure; the AI finds the exact edge where the pile meets the ground, works out its volume and checks the result.

Farness studio

Basemap © Mapbox © Maxar

Your yard in October, seen from the drone, with the pile outlinesThe same yard in November: one new limestone pile, solid fuel and limestone taken away, biomass deliveredWhat moved between October and November: material taken away in red, added in blue P-01 25,647 m³ 20,946 m³ −4,701 m³ P-02 541 m³ 541 m³ no change P-03 3,101 m³ 4,140 m³ +1,039 m³ P-04 2,117 m³ 2,575 m³ +458 m³ P-05 not there yet 1,709 m³ +1,709 m³ P-06 12,306 m³ 10,849 m³ −1,457 m³
Pile outlines drawn by our AI
Taken away Added

Your Site, from October to November

Every stockpile, its volume and what changed since the last survey.

  • 6 stockpiles
  • 40,760 m³ · 40,684 t in November
  • −2,952 m³ since October

Your November report: stock per pile, what changed since October, and the points to check on site. Download the report (8 pages, PDF, 0.8 MB)

For your teams

Each Team Sees What Matters to It

Managers, engineers and surveyors look at the same survey with different questions. Farness answers each of them in their own words.

Site and Plant Managers

One clear picture of your site, whenever you need it.

  • Stock in tonnes beside your books, ready for the close
  • What changed since the last survey, and what to deal with first
  • Your surveys, your ERP and your team’s reports in one place
Works and Production Engineers

Plan against actual, zone by zone, survey after survey.

  • Volumes moved per zone and per bench, against the plan
  • Production and sales set against the stock on the ground
  • Haul roads checked for gradient, width and berm height
Surveyors and Topographers

Survey data you can check, edit and take into your own tools.

  • Orthophoto, surface model and contour lines on your site grid
  • Every outline the AI draws, open for you to review and correct
  • Ground control points, the same on every survey

Talk to Our Account Team

Start with One Site.
Tell Us What You Want to Follow.

We start with a paid pilot on one site, sized to what you want to measure.

Tell us about your site.
We will call you back.

Not ready for a call?

See what you receive